NEC Option A, B and C compensation events move fast on a data centre programme — accelerated timelines and long-lead procurement mean a change decided in a meeting can carry six-figure programme and cost consequences within weeks, not months.
Our commercial management for data centre clients runs from commencement through to final account: interim valuations, cashflow forecasting, bottom-up and earned-value reporting, and NEC change control that keeps pace with a programme that isn't going to slow down to wait for it.
On a data centre, the compensation event process has to move at the same speed as the construction programme, or it stops doing its job.